How many items before you believe a 2-point change?
Size an extraction feature's golden set to see a 2-point drop overall and a 5-point drop per slice, and cost the labelling and each run.
On this page
A team wants its eval to catch a 2-point drop before a model update ships. The set they have is too small to see one, and the estimate says how much bigger it must be and what that costs.
The situation
An invoice-extraction feature reads a supplier invoice and returns supplier, dates, currency, line items and total; an item passes only if every field matches its label. It passes 95% of a 150-item golden set. A model update is due, and the team wants a gate that catches a 2-point drop overall and a 5-point drop in each of four supplier-format slices, one of which — scanned PDFs — is 7% of traffic.
Labelling an invoice takes about 3 minutes, and a second look at a disputed one about 5. Assume the course constants: P_in = $3 and P_out = $15 per million tokens, decoding at 50 tokens/s, about a second to the first token. Each item is about 3,000 tokens in and 400 out, and the harness runs 10 items in flight. Treat a change as believable when it is at least two standard errors. The lesson this practises is regression gates.
The question
Estimate how many items the set needs, what growing it costs in labelling time, and what one run costs in money and minutes, then decide whether it is worth doing.
A strong answer · Rubric · Where answers go wrong
Write your answer first, then open